Maersk Canadian Pacific Cross-Dock Facility

Home » Projects » Industrial » Maersk Canadian Pacific Cross-Dock Facility

Project Description

Maersk Pacific Transload Express – A Milestone Project by Liberty Steel Buildings

Liberty Steel Buildings is proud to have played a pivotal role in the construction of Maersk’s Pacific Transload Express facility in Vancouver. As the pre-engineered steel building contractor on this monumental project, Liberty was entrusted with delivering a robust and sustainable building solution. This state-of-the-art 117,000-square-foot facility, featuring 103 doors, was designed to enhance the efficiency of Pacific Northwest (PNW) supply chains, allowing for optimized cross-docking and streamlined distribution across North America.

Liberty’s scope of work was comprehensive. We provided pre-construction design assistance, including visual rendering models that helped refine the architectural vision. Our team delivered the full building package, including the pre-engineered steel structure, long-bay roof system, insulation, cladding, custom building appliques, interior liner, mezzanine structure, and steel stairs. Acting as a sub-trade to the project general contractor, Liberty managed the entire process of design, fabrication, and installation with precision and efficiency.

The Pacific Transload Express facility stands as a testament to Liberty Steel Buildings’ expertise in delivering large-scale, complex warehousing solutions. Our work supported Maersk’s vision of creating a more sustainable and resilient supply chain network, with the building leveraging Canadian Pacific’s rail service to minimize carbon emissions and reduce road congestion.

This project not only highlights Liberty’s ability to execute challenging logistics and steel building projects but also underscores our commitment to sustainability, efficiency, and delivering results that exceed client expectations.

Location

Vancouver Intermodal Facility, Pitt Meadows BC

Size

117,000 SF

Highlights

Design-Assistance Services
117,000 SF Footprint
103 Loading Dock Doors
Long-bay Design
Two-Storey Administrative Offices
Mezzanine Structure
Structural Steel Stair Supply & Installation
Custom Building Exterior Appliques

Materials

Grey Flat Panel Hidden Fastener
White Flat Panel Hidden Fastener